Choose by what the product demands, and compare offers on the same scope. CISH supplies, installs and commissions imported complete lines, and works alongside local fabricators for steelwork where that makes sense.
The four routes compared
| Route | Strength | Weakness | Best for |
|---|---|---|---|
| Local machine fabricator | Low price, quick, repairs and parts nearby, built to your site | Precision, materials and controls vary; little documentation; output rarely guaranteed | Tanks, frames, troughs, simple mills, presses, conveyors, ovens |
| Importer or dealer | Machines from stock, local presence | Margins on top of factory price; support limited to what they sell | Single machines and spare parts |
| Chinese factory, direct | Lowest price for precision and automated equipment | You manage specification, Form M, freight, clearance, installation and support | Buyers with in-house engineers |
| Turnkey line company | One party responsible for the complete line and its output | Higher price than direct; check experience in your product | First lines and producers moving to automation |
When a local fabricator is the right choice
- The machine is mainly steelwork: tanks, hoppers, frames, troughs, platforms, simple conveyors.
- The process tolerates variation: grinding, mixing, simple pressing.
- You need it fast, and you value a workshop nearby for repairs.
- The volume is small and the capital must stay low.
When an imported line is the better choice
- The product must meet a standard or a buyer's specification every day.
- The process needs precision: filling accuracy, film thickness, block strength, milling grades.
- Hygiene matters: food-contact stainless, cleanable design, instruments.
- Automation is the point: labour per unit must fall.
- You need a guaranteed output and documentation for training and maintenance.
A mixed approach that often works
Many Nigerian factories buy the precision core of the line abroad and fabricate the rest locally:
| Imported | Fabricated locally |
|---|---|
| Filling and capping machines, film extruders, roller mills, block machines, packing machines, controls | Tanks, hoppers, platforms, structural steel, simple conveyors, guards |
This cuts freight and duty on bulky steelwork, uses local skills and keeps repairs close. The risk is at the interfaces: someone must design the whole line so the parts fit and the output is achieved.
Worked example: comparing two offers for the same line
An illustration only:
| Item | Local fabricator offer | Imported line offer |
|---|---|---|
| Equipment price | Lower | Higher on the machines, lower on steelwork if mixed |
| Output guarantee | Rarely written | Written, at commissioning |
| Materials and finish | Varies | Specified |
| Electrical controls | Basic | PLC and panels, documented |
| Delivery | Weeks | Build time plus shipping and clearance |
| Support | Nearby workshop | Contracted service and parts |
| Total cost on the same scope | Add rework and downtime risk | Add freight, duties and installation |
Put both on the same list of items and outcomes before comparing totals. Our guide on comparing offers on the same scope explains how.
Visiting a fabricator's workshop: what to look for
- Machines like yours under construction, not only finished photos.
- Welding and finishing quality, especially on parts that touch the product.
- Machining equipment for shafts, bearings housings and fits.
- Electrical work: panels, cable sizes, protection and labelling.
- Materials in stock: stainless grades for food parts, steel thickness for frames.
- Customers you can call who have run the machine for a year or more.
A good fabricator welcomes the visit and shows you rejected parts as readily as finished ones.
Where each route usually ends up after two years
Locally fabricated machines are typically cheaper to keep running for simple duties, because parts and repairs are close. Imported precision machines usually keep their output and product quality better, provided spare parts and trained operators are planned from the start. The worst outcome on either route is a machine that nobody can repair quickly, so build the support plan into the purchase.
Questions to ask any supplier, local or imported
- What output will you guarantee, on my product?
- What materials are used for parts that touch the product?
- Who designed the electrical controls, and are drawings supplied?
- Which machine like this have you built or supplied before, and where?
- What spare parts come with it?
- Who installs and commissions it?
- What warranty applies, and who pays to fix a fault?
- How quickly can you supply parts?
- What power does it need?
- What training is included?
Landed cost of the imported part
| Item | How to plan |
|---|---|
| Equipment | Ex-works or FOB |
| Freight and insurance | To the nearest port |
| Duty | ECOWAS CET band for each machine |
| Surcharge, CISS and ETLS | 7% of duty, 1% of FOB, 0.5% of CIF |
| VAT | 7.5% on value plus duties |
| Installation | Erection, electrical, commissioning |
For a complete project, equipment is usually only 35–55% of the total once freight, duties, civil works, utilities and installation are counted.
Mistakes we see
- Comparing a fabricator's machine price with an imported line's total. Put them on the same scope.
- Buying an imported line with no local support plan. Arrange parts and service before it lands.
- Fabricating precision parts locally to save money. Rework often costs more.
- No one responsible for the interfaces between imported and local parts.
- Ignoring power. Both routes need a supply that keeps the line running.
What we see in Nigeria
- Power shapes every line. About 5.4 GW of grid capacity is available nationally, according to NERC, so both local and imported lines must be planned with generation; manufacturers spent roughly ₦1.4 trillion on their own power in 2025.
- Capital is dear. With the maximum lending rate around 33.16% in mid-2026, delay and rework cost real money; a cheaper machine that misses output is not cheap.
- Tariffs. Imported machinery is assessed under the ECOWAS CET, usually in its lower bands; bulky steelwork made locally avoids freight and duty.
- Customs systems. Form M has moved to the B'Odogwu portal; plan imported items around it.
- The 4% FOB charge is suspended after its 2025 reintroduction; check before shipping.
Where CISH fits
CISH supplies, installs and commissions imported complete lines from audited factories in China, takes responsibility for the line's output, and can design the line so that suitable steelwork is fabricated locally. We do not name or rate local fabricators; we work with whoever the project needs.