China Industrial Service Hub — Africa

A line you can afford, from people who are here when it stops.

CISH delivers complete production-line solutions to African manufacturers — sourced from China, installed, commissioned, and kept running with local maintenance, spare parts within a week, and pricing well below European suppliers. You don't need to become a production engineer. That's the part we bring.

Installed production line running inside a working factory
1 week Most spare parts in your hands — via our own China–Africa supply channel
In Africa Our engineers and appointed agents — not a WeChat reply
A fraction Of European capital cost, for the same output class
The problem we actually solve

"We have never run a line like this before."

That is the sentence we hear most from African manufacturers. Not "my machine is broken" — but how do you size a line, specify it, commission it, run it at rate, maintain it on a schedule, and know which spares to hold?

You run a good business. You have never run a production line. That experience gap — not a shortage of skilled hands — is what stops most first lines from paying back. It is also why looking at machine catalogues gets you nowhere: a spec sheet can't tell you whether the line will work in your building, on your power, with your people.

So we don't sell machines. We sell the outcome: a line that runs at its rated output, operated by your team, supported by ours — and someone who still picks up the phone in year three.

Start with a free feasibility call →

What a first-time buyer is actually afraid of

"I'll spend everything, it won't work, and nobody will help me."

Every part of how we work answers that fear: one accountable partner, commissioning to an agreed output, operator training before handover, a wear-part kit specified on day one, and support that is physically in Africa.

Honest number up front: the equipment itself is only 35–55% of what a production-line project really costs. We put the full landed-and-installed picture in writing before you commit. See what the rest is →

What we do

Six ways in — one working line at the end.

Spare Parts & Support

Most parts in your hands within a week — through our own China–Africa logistics channel. For lines we supplied, and for Chinese-built lines we didn't.

Learn more →

Maintenance & Support

Scheduled preventive maintenance, breakdown attendance, and remote diagnostics — delivered by CISH engineers and appointed local agents.

Learn more →

Production Lines

Complete small and mid-sized lines: specified, sourced from China, installed, commissioned to rated output, and handed over with your team trained.

Learn more →

Line Upgrade & Recovery

Equipment you already own, back to design output — bottleneck diagnosis, controls upgrade, mechanical remediation, re-commissioning.

Learn more →

Operator Training

Your people, trained to run and maintain the line — during commissioning and after. Written procedures your team actually uses.

Learn more →

Feasibility & Line Sizing

A free 30-minute consult, then a capacity model, layout, and budget band — so you can decide with numbers, not brochures.

Learn more →
The one-row argument

What are you actually buying?

Buy direct from ChinaBuy EuropeanCISH
What you're buyingA machineA machine plus a service contractA working line
Capital costLowHighLow
Someone accountable in AfricaNoSometimesYes

See the full comparison →

Budget honesty

There's an entry point at every budget.

Start where your capital is today; upgrade when the line has paid for itself. Bands are equipment cost in USD — landed-and-installed totals run ×1.25–1.45 for coastal markets and ×1.45–1.60 landlocked. Why the difference matters →

Step 1

Recover what you own

US$60k–250k

Get idle or underperforming equipment back to rated output. The fastest payback in the building.

Step 2

Build with used equipment

40–60% of new

Where budget is the constraint — inspected, refurbished, commissioned, and supported like a new line.

Step 3

New small line

US$150k–400k

Entry food, beverage, or packaging line — the class European vendors ignore and direct import can't support.

Step 4

New mid line

US$400k–900k

Oilseed, milling, plastics, and larger food lines for the second-line buyer adding real capacity.

Where we work

Sixteen markets. One support network.

Sourcing and shipping run on our own China channel; installation and support are delivered by CISH engineers and appointed local agents, mobilised from Johannesburg. Six core markets below — the full sixteen, from Ethiopia to Senegal, on the countries hub.

Ghana

Filling & packaging and plastics — including recycling lines — in West Africa's easiest legal entry point.

Production lines in Ghana →

Mozambique

Food & beverage and building-materials forming. Página disponível em português.

Linhas de produção em Moçambique →

Nigeria

The largest plastics market of our six core markets. We win on parts availability and whole-line know-how.

Production lines in Nigeria →

Tanzania

Edible oil and refining, grain milling, building-materials forming. Africa's second-largest sunflower producer.

Production lines in Tanzania →

Zambia

Filling & packaging leads — and every quote includes the power solution, because a line that can't run isn't a line.

Production lines in Zambia →

Zimbabwe

Line recovery and upgrade first — plus filling & packaging, where 2024 imports more than doubled.

Production lines in Zimbabwe →
Industries

Food & beverage leads — everywhere.

Food & beverage equipment is 37–54% of serviceable Chinese machinery imports in every market we serve 2024 · UN Comtrade

Agricultural processing line

Agricultural Processing

Edible oil, grain milling, animal feed, fruit & veg

Explore →
Building materials forming plant

Building Materials

Block, brick, tile, dry-mix mortar, AAC forming

Explore →
Food and beverage bottling line

Food & Beverage

Filling & packaging, bottling, dairy, bakery, beverage

Explore →
Metal fabrication machinery

Metal Fabrication

Press, CNC, welding, surface treatment

Explore →
Plastics and packaging production line

Plastics & Packaging

Injection, blow moulding, extrusion, recycling

Explore →
How a project runs

One partner. Seven stages. No hand-offs.

1

Consult

Free 30-min call. We listen.

2

Feasibility

Capacity model, layout, budget band.

3

Design

Line specification you can hold us to.

4

Source & Build

Proven Chinese factories, tested before shipping.

5

Install

CISH engineers on your floor.

6

Commission

Run up to the agreed output — proven, not promised.

7

Maintain

Training, spares, scheduled support.

Tell us what you want to make.

What product, at what volume, in which country. We'll come back within two working days with a feasibility view — from an engineer, not a sales script.